Yucheng Zeyu Machinery CO., LTD

Micro Beer Brewing Equipment

Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price

Quick Information

  • Brand Name: Zeyu
  • Place of Origin: China
  • Model Number : ZY50-ZY5000
  • Processing Types : Alcohol

Description

No. Item Quantity Remark
Milling unit
1 Malt mill 1 Double/four roller, with grist hopper, hydrator
Brew house unit
1 Mash  1 Stainless steel
Tank Volume: 100L-5000
  With agitator
2 Lauter 1 Stainless steel
Tank Volume: 100L-5000
  With agitator
3 Kettle/Whirlpool 1 Stainless steel
Volume: 100L-5000
Steam/electric heating
4 Hot water tank   Stainless steel
1 Steam/electric heating
5 Wort Pump 2 Stainless steel                 
6   1 Stainless steel
Hot water pump
7 Heat Exchanger 1 Stainless steel
Double stage/single stage
8 Mashing Pipes Assorted Stainless steel
9 Working platform 1 Stainless steel
Fermentation unit
1 Fermenters Follow customers requirement Stainless steel
Volume: 100L-10000L
Dimple plate cooling jacket
2 Bright beer tanks Stainless steel
Dimple plate cooling jacket
Conical/domed bottom
3 Yeast Tank 1  Stainless steel,
4 Beer Pipes 1 set Sanitary tube, Plastic.
5 Coolant Pipes assorted Stainless steel
6 Insulation Pipes assorted Polyurethane
Cooling unit
1 Ice Liquor Tank Assorted SUS 304 Stainless steel
Double layers, polyurethane
Capacity being confirmed as actual cool requirement
2 Chiller Assembly unit
3 Ice Liquor Pump   Stainless steel
4 Pipes & Valves assorted Stainless steel
CIP unit
1 CIP unit 1 plant 100L -500L
  Stainless steel
  Include alkali, acid, sterilize hot water tank etc.
   
Control unit
1 Control Cabinet 1 Stainless steel
With power control
2   1 PLC control
Touch Screen
Service item
1. Brewery instruction
1) This is the whole brewing plant, filling unit proposal being offered separately
2) We can handle the transportation to destination port
3) The warranty time is 12 months,
4) If customer needs, we can appoint our engineer for the installation.
2. Installation instruction:
1) Electrical parts fit the local power requirement.
2) Ice water tank contains mixed liquid of glycol and water. Chiller being installed outside of the house to avoid any noisy problem. 


Price

  • Price Condition : EXW
  • Delivery Port : qingdao

Packaging & Delivery

  • Packing :steel framed packed
  • Delivery Lead Time : 30-50 days, depends on capacity
  • Supply Ability : Min 500 plants per year.

Product Image

  • Micro Beer Brewing Equipment image

Related products from premium suppliers on EC21

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To James
Yucheng Zeyu Machinery CO., LTD
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Beverage Processing Machinery
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
EC21.com does not guarantee the validity of product information or the credentials of sellers.

Browse: Manufacturer Directory Premium Suppliers Site Map

About EC21 Contact Us Terms & Conditions Report Item Online Trading Risks Product Listing Policy

Copyright (c)1997-2026 EC21 Inc. All Rights Reserved. EC21 in KoreanChinese

Business Registry Number: 120-86-03931 | Mall order sales Registration Number: 강남-5838